Hydroelectric Project Refueling Fraud Case Study: Closing the Gap Between Dispensed and Received Diesel

Fuel dispensed is not always fuel received in the tank. At a hydroelectric project site, Aether reconciled bowser refuelling records with DG tank-level data and identified 17,000-18,000 litres of unaccounted diesel in one month, worth around ₹15-16 lakh.

Read More

Transit Mixer Fuel Optimization: From Fuel Loss to Fuel Control at a Metro Project

At a large metro construction project, 32 Transit Mixers were running across every shift. The site had ERP records and manual fuel logs, but none of it could answer the one question that actually mattered: was the diesel being consumed by operations, or was it being lost through theft and manipulation?

Read More

How Aether Delivered Fleet & Fuel Management for India’s High-Speed Rail Construction Project

Aether's Fleet & Fuel Management deployment on India's first high-speed rail construction project (MAHSR) — addressing fuel pilferage at source, correcting consumption norms through verified data, and providing the P&M team with evidence-backed findings to support operational decision-making.

Read More

India’s First Bullet Train Project (MAHSR) – Engineering, Construction & Execution

An in-depth case study covering the planning, engineering, construction technologies, infrastructure development, and execution strategy behind the Mumbai–Ahmedabad High-Speed Rail (MAHSR) project — India’s first bullet train corridor.

Read More

Underground Metro Fuel Management Case Study: From Invisible Losses to Enforceable Control

How a 90+ asset metro site cut fuel losses from 1,700+ L in Q1 to 130+ L in Q4 through validation, intervention, and norm recalibration.